Energy Performance Project
Energy Performance Project

The Physical Plant will soon be completing a $50 to $80 million energy conservation project for the campus. The Capital Improvement project will be funded by utility savings over the next ten years. A key goal of the project is to improve campus building performance in conjunction with saving on operating costs. Since the contractor will guarantee the performance of the measures, the agreement is commonly called a performance contract. Some of the more obvious components to undergo renovation will be lighting and lighting controls, new chillers and other building mechanical improvements, water conservation measures including low flow toilets, and steam and electric distribution improvements including building metering

Johnson Controls was selected as the contractor for this project to maximize capital improvements and to significantly reduce the deferred building maintenance backlog on campus. This proposal is designed so that our buildings will be modified and operated to provide better lighting, heating, cooling and ventilation for building occupants. Key strategies include efficiency improvements and the use of a computerized control system that can be set to either time or motion in order to turn things off during unoccupied hours (this system can be overridden from a central location). In addition to the physical modifications, through various outreach programs we hope to reinforce the economic and environmental importance of energy and water conservation in the campus community.

Johnson Controls has completed a detailed audit that refined the costs and savings estimates of each Energy Conservation Measure (ECM) in its proposal. A few examples of the ECM's proposed are; building transformer upgrades, installing variable speed drive motors, cogeneration in the power plant, replacing steam traps, and replacing inefficient building lighting. There are forty-five ECM's in the Johnson Controls proposal. Not all the ECM's will be implemented, only the ECM's that are proven worthwhile in the detailed audit phase will be executed.

As part of this project approximately $ 1,500,000 worth of meters have been installed in campus buildings. These meters will monitor the minute by minute usage of electricity, water, and steam in each building. This monitoring will establish a baseline of the energy usage in the individual buildings being monitored. This established energy usage baseline will determine how effective each proposed ECM will be. The baseline energy usage will also establish the performance guarantee for the ECM. If the ECM doesn't reduce the energy usage baseline in the building by the agreed upon level (28%) then Johnson Controls is liable to make up the shortcomings to the University.

The construction phase will be completed in the next six to twelve months. The most advantageous ECM's have been implemented first to maximize project savings. While this project will cause some disruption to building occupants during the construction phase, the improved building performance, associated energy savings and level of comfort for the occupants will last many years.

The above article was written by Jason Burbank & Ray Jackson.


 

What are we doing Now?

Home | About Us | Phone Directory | Customer Information | What We Are Doing Now | Feedback

UMass Home | Admin & Finance | Facilities & Campus Planning

© 2004 University of Massachusetts Amherst. Site Policies.
This site is maintained by Physical Plant.
UMass Seal